Required when supporting a chimney through a flat level ceiling.
Selkirk pitched ceiling support kit instructions.
Where permitted it will provide support above the roof of an open cathedral ceiling installations.
The instructions that come with the kit are not detailed like the brochure that most stores have.
Given the high price for the pipe the kit surely justifies better instructions.
A detailed review of all toutube selkirk installation videos was of very marginal help and there are selkirku videos that are 8 years old very low resolution version with non matching parts.
Selkirk metalbestos pitched ceiling kit use this product page to add all of the standard components for a pitched ceiling installation with selkirk metalbestos class a chimney system.
All you need to do is add the length of pipe needed.
We also don t have time to return it otherwise we would request another kit.
Please click here for product and technical assistance or a handy rep locator.
Selkirk metalbestos 6t pck pitched ceiling support kit stainless.
Frame on all 4 sides a level square opening with the inside dimensions of 14 3 8 365mm square.
Offset support or an interior resupport.
Approval of this factory built chim ney is based on the use of parts supplied by selkirk metalbestos and installation in accordance with these instructions.
Selkirk also manufactures ceiling.
Chimney penetrates a roof.
2 elbows 1 offset support and 4 locking bands.
The roof support kit rsk is designed to provide support above the roof and adjusts to any roof pitch.
See figures 2 3 and 4.
The roof support kit rsk accommodates selkirk chimneys with outer diameters ranging from 7 through 16.
Strength safety and performance are at the heart of every product we make.
Instructions maintenance guide canada united states.
Figures 5 6 show the 2 most common types of decorator ceiling support installation.
Our local hardware store calls it the selkirk bible.
Install the support immediately above the offset or at 9 14 m 30 intervals.
Decorator ceiling support dcs.
13 m of chimney sections all of which must be installed above the support.